Nortec GS Series User Manual
Page 42
39 | GS Series Installation
Table 7: GS Inspection Check List
Humidifier Mounting
Verify proper clearances around the unit.
Humidifier mounted level.
Humidifier properly secured to stand and stand bolted to floor.
All service doors accessible.
Roof curb sized correctly (Outdoor Model Only).
Gas Piping
Correct gas line size installed.
Certified manual shut off valve and union installed.
Sediment trap installed.
Gas piping leak tested.
Air purged from lines.
Proper gas supply pressure.
Regulator dedicated for each gas unit.
Exhaust Gas Venting
Comply with local regulations.
Proper venting materials used (B or BH) – refer to gas codes.
Maximum vent length of 100 feet (70 feet for direct vent models).
Proper pipe diameter used.
Condensate tee installed.
Steam Lines
Slope up 2” per 12”
Sloped back to drain
Slope down ½” per 12”
Trapped 2” more than static duct pressure
Traps size ____________
Insulated
Length/Size ____________
90 deg. Elbows qty: ____
45 deg. Elbows qty: ____
Can condensate be trapped anywhere in the steam line? yes ___ no ___
Condensate Lines
Sloped back to drain
Trap is greater than 2” duct static pressure
Size of trap____________
Supply Water Line
Nortec supplied adapter installed on fill valve (½”NPT)
Manual shut off valve and union installed
Verified pressure (30 – 80 psig)
Water source of 10 l/min (2.6 gpm)
Leak tested
½” dia. At max 4ft of the unit