Before Pour:

1. Locate box position. Orientation of duplex

receptacle is aligned with the conduit.

2. Cement conduit closure plugs to unused ports and conduit

reducers if reduction from the 1" [25mm] hubs is required.

3. Secure box to grade or form using nails, screws,

rebar and wire or other appropriate means.

4. Cement conduit feed to hubs/reducers.

5. Pour concrete to required height (2 1/4" to 6 1/2" [57mm to 165mm]).

6. If used for dual service, use the center hubs for power and the outer hubs for low voltage.

After Concrete Sets:

1. Use a hand saw to cut the top of the box

extending above the floor surface (see Figure 1).

2. Tile: Cut must be square and parallel

with the floor surface for tile applications.
a.

For 1/8" [3.2mm] thick tile, cut top
of box flush with concrete pour.

b.

For 3/8" [9.5mm] thick tile, cut top
of box 1/4" [6.4mm] above concrete
pour (see Figure 2).
1. Cut away flanges at screed

level (see Figure 3).

2. Apply tile over concrete

floor (see Figure 4).

3. 1/4" [6.4mm] of grout

is required between tile
flange and tile (see Figure 5).

Ratchet-Pro

881 PVC Floor Box

895DCC Cover

INSTALLATION INSTRUCTIONS

Walker

®

electrical systems conform to and should

be properly grounded in compliance with require-
ments of the current National Electrical Code or
codes administered by local authorities.

All electrical products may present a possible
shock or fire hazard if improperly installed or
used. Walker electrical products may bear the
mark as UL Listed and/or Classified and should
be installed in conformance with current local
and/or the National Electrical Code.

Low Voltage

Power

4 1/4" [108mm]

Flange Diameter

Figure 1

Cut Edge

Figure 3

1/4" [6.4mm]
Above Concrete

Figure 2

4 3/4"

[121mm]

1/4" [6.4mm]

Clearance

Required

Between

Flange and Tile

Figure 4

Figure 5

Saw Away
These Sections