beautypg.com

Legrand RFB2 User Manual

Page 2

background image

AFTER CONCRETE POUR:

NOTE: This box and activation are UL Listed for use with

tile, terrazzo, and carpet covered concrete floors,
and also wood floors.

NOTE: Use insulator provided with the following catalog

numbers, installed as shown: RFB2DP, RFB2GFI.

Step 6. Locate box and chip away concrete located in mud

cap. Remove mud cap, and clean out any debris from
inside of box. If concrete does not break cleanly around
preset, the activation might not be properly supported.
The concrete edges around the top opening of the
installed box must be smooth and level for the proper
fit of the FloorPort Activations. Remove device
brackets, and the tunnel block(s) if required to provide
for the same service in both compartments. To access
the tunnel blocks, remove the tunnel support and then
re-install after removing the required block(s).

Step 7. Wire devices (not supplied by Wiremold), making sure

that any ground leads are properly connected to
ground screws. Attach the receptacle to the receptacle
mounting bracket using the #6-32 screw provided.
Secure the receptacle to the receptacle mounting
bracket with (2) additional screws and nuts, (not
provided). Attach the receptacle mounting bracket(s) to
the base with the (2) #8-32 mounting screws provided.

Step 8. Complete procedure by installing a Wiremold FloorPort

Activation, (sold separately), using the installation
instructions provided with that unit.

This manual is related to the following products: