beautypg.com

Completing installation of rc9afftc and rc9cfftc – Legrand 291-H/BTC User Manual

Page 3

background image

Step 3. Install outlets, communication devices

Step 4. Attach cover plate using

and corresponding faceplates.

the #8-32 screws provided.

NOTE: If communication is required, connect necessary wires

to communication jacks and snap into opening provided
in faceplate.

Completing Installation of RC9AFFTC and RC9CFFTC:

Step 1. Insert poke-thru stem into hole. Orientation of 1/2" trade size

conduit should be directed towards power termination point.

CAUTION: Poke-thru stem cannot be rotated after insertion.

3

If Stem and Service
Head Ordered
Separately, Install Stem

Push Down

Push Down

This manual is related to the following products: