Hoefer SE300 miniVE User Manual
Page 20

•
p12
The minimum and maximum levels are marked. Verify
that the lower electrode, which is approximately
2 cm from the bottom of the module, is completely
submerged. To prevent buffer from entering the upper
buffer chamber, verify that the buffer level is not
above the maximum level.
Add the appropriate amount of electrophoresis buffer
to the upper buffer chamber.
Fill the upper buffer chamber to a level 3 – 5 mm
above the notched plate. This requires approximately
100 ml.
Prepare and apply the sample.
Increase liquid sample density with 10% glycerol or
sucrose. Add a tracking dye, such as bromophenol blue.
Fig 12. Preparing for
electrophoresis.
Tip: As an aid in loading samples,
mark the well location with a labo-
ratory marking pen or use locating
decal. The locating decal only
works with miniVE combs and not
precast gels.
the half-open postion
for electrophoresis
upper buffer chamber
- IEF100 (65 pages)
- IEF100 (65 pages)
- SE900 (37 pages)
- SE260 (31 pages)
- SE260 (31 pages)
- SE300 miniVE (37 pages)
- SE300 miniVE (37 pages)
- SE410 (51 pages)
- SE410 (50 pages)
- SE640 (51 pages)
- SE640 (50 pages)
- SE275 (21 pages)
- SE245 (13 pages)
- SE675 (27 pages)
- SG100 (9 pages)
- SG500 (12 pages)
- SQ33 Sequencer (30 pages)
- SQ33 Sequencer (30 pages)
- SQ33 Sequencer (30 pages)
- HE33 (26 pages)
- HE33 (26 pages)
- HE99X (26 pages)
- HE99X (26 pages)
- HE-PLUS System (26 pages)
- HE-PLUS System (26 pages)
- SUB Series (31 pages)
- SUB Series (31 pages)
- TE70X (31 pages)
- TE70X (31 pages)
- PR648 (11 pages)
- PR150 (9 pages)
- PR645 Immunoblot XL (21 pages)
- TE22 (35 pages)
- TE22 (35 pages)
- TE62 (35 pages)
- TE22 (31 pages)
- DQ300 (30 pages)
- DQ300 (30 pages)
- UVIS20 (21 pages)
- UVIS20 (21 pages)
- SP-2001 Vision Life Spectrophotometer (66 pages)
- Single Channel Variable Pipette (8 pages)
- PR250 (18 pages)
- PP24 (10 pages)