Hoefer SE300 miniVE User Manual
Page 19

•
p11
Check that both gel surfaces will contact buffer.
Check that the bottom gel-contact slot is exposed.
Move the sealing plate into the “half open” position to
prepare for electrophoresis. Apply gentle inward pres-
sure to both tabs and lock them into the lower notch.
Final assembly
Make sure the sealing plate is in the “half-open” posi-
tion. The arrow in Fig 12 indicates the correct position.
Lower each module into the tank, seating it in the
locating slots.
The module seats properly in only one orientation —
with the banana plugs toward the center of the tank
and the gel facing outward.
Add the appropriate amount of electrophoresis buffer
to the tank.
Add 1.2 – 1.6 liters of buffer to the tank when only
one module is in place, and 1.1 – 1.4 liters when two
modules are in place.
Fig 11. Securing the cassette.
a
a
- IEF100 (65 pages)
- IEF100 (65 pages)
- SE900 (37 pages)
- SE260 (31 pages)
- SE260 (31 pages)
- SE300 miniVE (37 pages)
- SE300 miniVE (37 pages)
- SE410 (51 pages)
- SE410 (50 pages)
- SE640 (51 pages)
- SE640 (50 pages)
- SE275 (21 pages)
- SE245 (13 pages)
- SE675 (27 pages)
- SG100 (9 pages)
- SG500 (12 pages)
- SQ33 Sequencer (30 pages)
- SQ33 Sequencer (30 pages)
- SQ33 Sequencer (30 pages)
- HE33 (26 pages)
- HE33 (26 pages)
- HE99X (26 pages)
- HE99X (26 pages)
- HE-PLUS System (26 pages)
- HE-PLUS System (26 pages)
- SUB Series (31 pages)
- SUB Series (31 pages)
- TE70X (31 pages)
- TE70X (31 pages)
- PR648 (11 pages)
- PR150 (9 pages)
- PR645 Immunoblot XL (21 pages)
- TE22 (35 pages)
- TE22 (35 pages)
- TE62 (35 pages)
- TE22 (31 pages)
- DQ300 (30 pages)
- DQ300 (30 pages)
- UVIS20 (21 pages)
- UVIS20 (21 pages)
- SP-2001 Vision Life Spectrophotometer (66 pages)
- Single Channel Variable Pipette (8 pages)
- PR250 (18 pages)
- PP24 (10 pages)