Unit 3h, Top foil length worksheet – Harken 7413.15 MKIV Hydraulic Jib Reefing & Furling User Manual
Page 10

10
MKIV Hydraulic Unit 3
Preassembly
Top Foil Length
Length Chart
Dimensions
Inches
mm
A Center of Pin to Bottom of Terminal
B Bottom of Terminal to Top of Foil
1.00
25
C Top Foil Length
D Number of Foils ________ x 84" (2133.6 mm)
E Bottom Foil
24.00
610
F Bottom of Foil to Top of Toggle Housing Insulator
23.18
589
G Top of Toggle Housing Insulator to Clevis Pin
Pin-to-Pin Length
Measure A and add to this chart
and length chart below
Inches
mm
A
B
1
25
E
24
610
F
23.18
589
G
Total A+B+E+F+G
Make sure upper
measurement points
of A and Pin-to-Pin
are the same.
1
Pin-to-Pin Length
2
Subtract ABEFG –
3
Result (Pin-to-Pin – ABEFG)
4
Subtract D –
To find “D” pick number from chart below that is closest to,
but not greater than total from step 3.
Inches
mm
7 x 84 = 588
8 x 84 = 672
9 x 84 = 756
10 x 84 = 840
11 x 84 = 924
7 x 2133.6 = 14935.2
8 x 2133.6 = 17068.8
9 x 2133.6 = 19202.4
10 x 2133.6 = 21336
11 x 2133.6 = 23470
Example–If result from Step 3 is:
800 inches “D” = 756 inches 20,000 mm “D” = 19,202 mm
5
Result (C) Top Foil Length
After completing worksheet above fill in A, C, D and G below. Add
“A” through “G” to confirm total equals your pin-to-pin measurement.
Length Check
Alternate
Measurement
Point
A
Pin
to
Pin
TOP FOIL LENGTH WORKSHEET
G Toggle Distance from Lower Clevis Pin to Top of Toggle Housing Insulator
Toggle
Part No.
Type
Clevis Pin
G Distance
in
mm
in
mm
7413.25 3/4
Toggle Assembly
3
/
4
19.1
4.39
112
7313.25 7/8
Toggle Assembly
7
/
8
22.2
4.98
126
7413.26 3/4
Hydraulic Cylinder/Toggle
3
/
4
19.1
19.32*
491*
7313.26 7/8
Hydraulic Cylinder/Toggle
7
/
8
22.2
19.99*
508*
*Dimensions with cylinder 58% open
UNIT 3H
Cylinder Pin
Ø
G Distance (Closed)
G Distance (Open)
in
mm
in
mm
3/4
17.00
432
21.00
533
7/8
17.67
449
21.67
550
A
C
D
E
F
Pin
to
Pin
B
G
G