General Description - NOT model specific

Model ERCH Energy Recovery Ventilator

®

38

7. Set the Optional Auto Drain and Flush. This

system will automatically drain the sump tank and
fill it with fresh water at the field-adjustable intervals,
typically once every 24 hours. This flushes mineral
build-up and debris from the tank to promote low
maintenance and increase media pad life.

In addition, the system will protect the evaporative
cooler from freezing by draining the sump tank and
supply line when the outside temperatures fall below
the set point of the outside air sensor. This is set
to 45° F and is not adjustable. The auto drain and
fill outdoor air sensor should be installed in an area
that is shaded from direct sunlight so the outside air
sensor probe will detect an accurate air temperature.

Evaporative Cooler

1. Check the Installation. The media may have been

removed during installation, so its orientation should
be double
checked. The
media should
be installed
with the
steeper flute
angle sloping
down towards
the entering
air side.

Verify that the stainless steel caps and distribution
headers are in place. The headers should be located
over the media towards the entering air side. The
caps should be placed over the headers.

2. Check the Pump Filter. Check that the pump filter is

around the pump inlet.

3. Fill the Sump and Adjust the Float. Turn on the

water supply and allow the sump tank to fill. Adjust
the float valve to shut-off the water supply when the
sump is filled to within one inch of the bottom of the
overflow.

4. Break-In the Media. Open the bleed-off valve

completely and saturate the media with the blower(s)
off for no less than 20 minutes.

5. Check the Flow Rate. The pumps should provide

enough water to saturate the media in 45 to 60
seconds. Consult the factory if adequate flow is not
achieved.

6. Adjust the Water Bleed-Off Rate. The water bleed-

off rate is dependent on the water’s mineral content.
The bleed-off should be adjusted based on the
media’s mineral deposits after two weeks of service.

Leaving Air

Entering Air

45º

15º

Media Orientation

IMPORTANT

Check the media for minerals after two weeks of
service and adjust the bleed-off rate accordingly.

Bleed-Off

Valve

Overflow

Pump

Filter

Threaded Float

Adjustment

Supply

Connection

Float

Valve

Evaporative Cooler Set-Up

NOTE

A jumper will need to be installed in the control center
to power the evaporative pumps with the blower(s)
off. Reference the unit’s ladder diagram to determine
proper terminals.

Set the Timer Scale and Settings dials:

• t timer setting set to 10 and timer scale set to

1d for 1 day of operation

• T2 timer setting set to 10 and the timer scale set

to 10m for 10 minutes of drain time

8. Put the Unit into Service. Remove the jumper, and

energize the blower(s). Verify proper operation.

Timer
Scale

Timer
Scale

Timer

Settings

T1

Settings

T2

Settings

Auto Drain and Flush Timer