General Description - NOT model specific

Model ERCH Energy Recovery Ventilator

®

30

Line Voltage. Check at unit disconnect.

L1-L2

Volts

L2-L3

Volts

L1-L3

Volts

Motor Amp Draw

Supply Motor Amps

L1

Amps

L2

Amps

L3

Amps

Exhaust Motor Amps

L1

Amps

L2

Amps

L3

Amps

Fan RPM

Correct fan rotation direction?

Supply Fan

RPM

Supply Fan

Yes / No

Measured Airflow

CFM

Exhaust Fan

RPM

Exhaust Fan

Yes / No

Measured Airflow

CFM

Energy Wheel Motor

L1

Amps

L2

Amps

L3

Amps

Every installation requires a comprehensive start-up
to ensure proper operation of the unit. As part of that
process, the following checklist must be completed and
information recorded. Starting up the unit in accordance
with this checklist will not only ensure proper operation,
but will also provide valuable information to personnel
performing future maintenance. Should an issue arise
which requires factory assistance, this completed
document will allow unit experts to provide quicker
resolve. Qualified personnel should perform start-up to
ensure safe and proper practices are followed.

Unit Model No. __________________________________

Unit Serial No. ____________________________________

Heat Pump Model No. ____________________________

Energy Wheel Serial Number _______________________

Compressor 1 Model No. _________________________

Compressor 2 Model No. _________________________

Start-Up Date ____________________________________

Start-Up Personnel Name _________________________

Start-Up Company ________________________________

Phone Number ___________________________________

Pre Start-Up Checklist

†Disconnect and lock-out all power switches.
† Remove any foreign objects that are located in the

energy recovery unit.

† Check all fasteners, set-screws, and locking collars

on the fans, bearings, drives, motor bases and
accessories for tightness.

† Check fan rotation.

† Rotate the fan wheels and energy recovery wheels

by hand and ensure no parts are rubbing.

† Check the fan belt drives for proper alignment and

tension.

† Filters can load up with dirt during building

construction. Replace any dirty pleated filters and
clean the aluminum mesh filters in the intake hood.

† Verify that non-motorized dampers open and close

properly.

† Check the tightness of all electrical wiring

connections.

† Verify control wire gauge.
† Verify diameter seal settings on the energy recovery

wheel.

† Verify proper drain trap installation.
† Check condensing fans for any damage or

misalignment. Spin the blades and make sure they
don’t contact any parts and are free-turning without
any resistance.

† Look over the piping system. Inspect for oil at all

tubing connections. Oil typically highlights a leak in
the system.

† Inspect all coils within the unit. Fins may get

damaged in transit or during construction. Carefully
straighten fins with a fin comb.

† If there is an indirect gas-fired furnace in this unit,

refer to the manual provided with this unit for Pre-
Start-Up information.

† This unit contains a crankcase heater for each

compressor which needs power supplied to it
24 hours prior to start-up. If start-up is scheduled
in 24 hours, unlock the disconnect power and
energize unit.

Start-Up Checklist

Pre Start-Up