beautypg.com

Gasboy Cabling User Manual

Page 2

background image

Page 2

C36009 Rev. 0053

TopKAT With 9800 Direct Connect

NOTES:

See TopKAT Direct Connect in the Cables section for point-to-point connections. When using an RS-232
termination box, connect a 1:1 cable (P/N C04654) between the PC and the termination box. Wire the
termination box to the Series 900 TopKAT as shown in the Installation Manual.

When operating a TopKAT in a master/satellite configuration, an RS-422 short haul modem (SHM) is
required for a direct connection between a PC and the TopKAT master. The RS-422 connection is made to
Port 3 at the TopKAT master. RS-422 GASBOY SHM wiring diagrams are available in the TopKAT
Installation Manuals.

Cables

The following diagrams show the point-to-point wiring for the RS-232 cables. Cables with GASBOY part numbers (P/Ns)
can be purchased from GASBOY in standard eight foot lengths. See your card system Installation Manual for specific
requirements of RS-232 wiring.

EIA 1:1 M/F Cable (P/N C04654)

DTE Cross M/F Cable (P/N C05928)