DNF Controls UABS-I Installation_Manual User Manual
Page 19
Flex Control Network
®
UABS-I Installation Manual
1
1
8
8
of 18
7. CP20 INSTALLATION
CAUTION
Do NOT apply AC voltage to the power supply, before connecting the power
supply to CP20 CONTROL PANEL. Component damage may occur.
1) Connect a Cat 5 cable to CP20 CONTROL PANEL connector labeled “E-
NET #1”. Connect other end of the Cat 5 cable to customer supplied
Ethernet hub.
2) Connect power supply DB9 female connector to the CP20 CONTROL
PANEL connector labeled “POWER“.
3) Connect female side of AC power cable to the supplied power supply.
4) Connect male side of AC power cable to 100 – 240VAC.
5) Push the CONTROL PANEL power switch, located on rear panel, to ON
position. “O” on the power switch is the OFF position.
6) When power up and system initialization completes, the front panel
display will show Model Number and Software Version. Allow 25
seconds for power up and system initialization to complete.
CAUTION
Do NOT apply AC voltage to power supply, then hot plug the power supply to
the CP20 CONTROL PANEL. Component damage may occur.