Allocation of receivers, Starting up – Delta Dore 230 CPL DRIVER Installation User Manual
Page 6

- 10 -
- 11 -
4.2 The unit is not associated with a GECPL1, GP4
CPL, etc.
The "EMET" screen flashes.
The identification of the relevant heating zone is displayed.
➊
Confirm on the zone 1 receivers
➋
Press
. The unit goes to zone 2.
➌
Confirm on the zone 2 receivers.
➍
Press
. The unit goes to zone 3.
➎
Confirm on the zone 3 receivers.
➏
Press
to confirm and exit the mode.
Indication of the
relevant heating
zone
Z2
Z3
Z1
Allocation of receivers
You must associate each receiver to the central control unit
and you can determine the load-shedding channel to which it
is allocated (if DRIVER 230 CPL is associated with an
energy manager: GECPL1, GP4 CPL, etc.).
4.1 The unit is associated with a GECPL1, GP4 CPL, etc.
➊
Press
or
to select the load-shedding channel to
which the receivers will be allocated.
➋
Confirm on the relevant receivers.
➌
Repeat operations
➊
and
➋
for the receivers allocated to
another load-shedding channel
➍
Press
to confirm your selection and move onto zones 2
and 3. Repeat the operation.
➎
Press
to confirm and exit the mode.
4
Starting up
The load-shedding channel can be selected from d:0 to d:6
(d:0 = no load shedding).
For use with GECPL1, channels d4, d5 and d6 must not be
allocated (no load-shedding).
Z2
Z3
Z1
Selecting the
load-shedding channel
Indication of the