Schedule Setup

Figure 3-17 Out-of-Band Circuit diagram

Use one of the following procedures—Point-to-Point InBand, Point-to-Multi-

Point InBand, or Upstream Switch—to select the circuit options to be used for

an event that is being scheduled.

Note: The circuit type that can be used for a scheduled event may be limited by

the available satellite network hardware and bandwidth.

Tip: Click on the Uncheck All button located below the network device list to

remove checks from all boxes in the dialog.

Point-to-Point Out-of-Band

Although this Circuit Type appears as a selection option, it is not supported in

v3.7.2 of the VMS.

Point-to-Point InBand

In figure 3-18, the Point-to-Point InBand circuit type has been selected using

the Circuit Type radio button. Use the following procedure to select the equip-

ment to be used during the scheduled event.