beautypg.com

Comtech EF Data Vipersat Circuit Scheduler v3.7.x ArrangeLink User Manual

Page 48

background image

Introduction

3-6

ArrangeLink User Guide

This will prevent creating a new schedule that is in conflict with an existing

schedule.

Note: If there is a VMS managed event that is ongoing at the time of a sched-

uled event, assigned priorities will determine whether or not the sched-

uled event will supersede the ongoing event and take over the SCPC

circuit.

See the section “Advanced Switching” on page 3-22 regarding the

setting of the Priority level for a scheduled event.

NOTE