beautypg.com

Cv) m – AMETEK SL Series Software User Manual

Page 16

background image

Calibration Procedure

Elgar Electronics Corporation

2.2.4

C

ONSTANT

V

OLTAGE

(CV) M

ODE

C

ALIBRATION

, C

HANNEL

A

1.

Connect the load to the DMM and DC power supply per Figure 2-7,
Figure 2-8, or Figure 2-9
, for the Load module being calibrated.

Note: Figure 2-7 refers to both SLD-60 and SLD-80.

2.

Set the power source current limit to 0.1A

3.

Set the load to CV mode by pressing the MODE key until CV is lit.

Figure 2-7. Channel A CV Mode Connections for SLD-60 or SLD-80 Calibration

Figure 2-8. Channel A CV Mode Connections for SLD-61 Calibration

Figure 2-9. Channel A CV Mode Connections for SLD-62 Calibration

2-8

SLD Calibration Manual