Surge and reservoir tank installation – Paxton Superchargers 5.7L Dodge Hemi User Manual
Page 33

1
P/N: 4809650
©2004 Paxton Automotive
All Rights Reserved, Intl. Copr. Secured
11NOV04 v1.0 03DodgeHemi(4809650v1.0)
Section 12
SURGE AND RESERVOIR TANK INSTALLATION
12. SURGE AND RESERVOIR TANK INSTALLATION
A.
Screw two supplied 3/4" x 1/2" NPT straight
brass fittings into the plastic surge tank.
B.
Using the supplied 1/4"-20 x .50" SHCS
screw and washers attach the supplied surge
tank to the supplied surge tank-mounting
bracket. (See Fig 12-a.)
Fig. 12-a
C.
The factory ground wire located on the pas-
senger side of the firewall will need to be
relocated. Using a 10mm socket remove the
nut securing the ground strap to the stud as
well as the nut secured on the stud to the
right of it. Secure the ground strap to the
second stud using the factory hardware.
D.
Attach the surge tank to the stud the ground
strap had been originally secured to using
the factory 10mm headed nut.
E.
Mark and drill a hole using the supplied
sheet metal screw to secure the open mount-
ing location on the bracket. See Fig 12-b.)
Fig. 12-b
F.
Mount the supplied water pump to the side
of the supplied triangle water reservoir using
the supplied 1/4"-20 hardware and adel
clamp.
G.
Install the supplied 3/4" x 1/2" NPT 90°
brass fittings into the water reservoir. Mount
the supplied triangle water reservoir to the
supplied reservoir mounting bracket using
the 1/4"-20 hardware provided. (See Fig.
12-c.)
Fig. 12-c
12.
SURGE AND RESERVOIR TANK INSTALLATION