beautypg.com

Preparing for operation, Connection, 6commissioning – Pilz PNOZ mo2p 2n/o User Manual

Page 20: 2 preparing for operation, 2 connection

background image

6.2

Preparing for operation

6

Commissioning

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

6-2

6.2

Preparing for operation

6200

Preparing for operation

6-

6.2.1

Download modified project to the PNOZmulti safety system

Download modified project to the PNOZmulti safety system

6-

Verdrahtung_multi_Modul_Betr_geaend_Projekt_BA

As soon as an additional expansion module has been connected to the

system, the project must be amended using the PNOZmulti Configura-

tor. Proceed as described in the operating instructions for the base unit.

6.2.2

Connection

Connection

6-

Betriebsbereitschaft herstellen

Relay outputs

Feedback loop

NOTICE

For the commissioning and after every program change, you

must check whether the safety devices are functioning correctly.

Redundant

Single

Feedback loop

Redundant output

Contacts from external contactors

O1 (3)

K1

L1

N

K2

14 (34)

13 (33)

23 (43)
24 (44)

O0 (2)

O1 (3)

K1

L1

N

K2

14 (34)

13 (33)

23 (43)

24 (44)

O0 (2)

O1 (3)

K1

L1

N

K2

14 (34)

13 (33)

23 (43)

24 (44)

O0 (2)

L+

I0

This manual is related to the following products: