Vertical dimensions cont, 25 tons, Envision 7-25 tons installation manual 7 – WaterFurnace Envision (XL) User Manual
Page 6: Left return, Right return top discharge side discharge, Top view, Side view
ENVISION 7-25 TONS INSTALLATION MANUAL
7
LEFT RETURN
6.0 in
15.2 cm
13.0 in
33.0 cm
15.2 in
38.7 cm
19.0 in
48.2 cm
24.5 in
62.2 cm
18.0 in
45.7 cm
18.0 in
45.7 cm
16.0 in
40.6 cm
16.0 in
40.6 cm
16.0 in
40.6 cm
16.0 in
40.6 cm
1.5 in
3.7 cm
1.5 in
3.7 cm
2.0 in
5.1 cm
2.0 in
5.1 cm
34.0 in
86.4 cm
14.2 in
36.1 cm
14.2 in
36.1 cm
2.6 in
6.5 cm
6.5 in
16.5 cm
88.1 in
223.8 cm
RIGHT RETURN
TOP DISCHARGE
SIDE DISCHARGE
88.1 in
223.8 cm
86.3 in
219.1 cm
1.0 in
2.5 cm
66.0 in
167.5 cm
2.0 in
5.1 cm
1.0 in
2.5 cm
34.0 in
86.4 cm
2.9 in
7.3 cm
86.3 in
219.1 cm
88.1 in
223.8 cm
18.0 in
45.8 cm
13.8 in
35.1 cm
18.0 in
45.8 cm
13.8 in
35.1 cm
TOP PANEL
COVER
2.9 in
7.3 cm
66.0 in
167.5 cm
2.0 in
5.1 cm
DRAIN CONNECTION
ELECTRICAL
CONNECTIONS
40.4 in
102.6 cm
41.8 in
106.2 cm
AIR COILS
AIR COILS
41.8 in
106.2 cm
40.4 in
102.6 cm
15.2 in
38.7 cm
19.0 in
48.2 cm
24.5 in
62.2 cm
2.6 in
6.5 cm
6.5 in
16.5 cm
6.0 in
15.2 cm
13.0 in
33.0 cm
1.7 in
4.4 cm
1.7 in
4.4 cm
DRAIN CONNECTION
WATER OUT
WATER IN
WATER OUT
WATER IN
ELECTRICAL
CONNECTIONS
2’ PRIMARY
SERVICE ACCESS
2’ SECONDARY
SERVICE ACCESS
2’ PRIMARY
SERVICE ACCESS
2’ PRIMARY
SERVICE ACCESS
Legend
AP = Alternate Service Panel
BP = Blower Service Panel
CP
=
Control
Access
Panel
CMP = Compressor Service Panel
CONTROL BOX
AND WATER
RIGHT RETURN
CONTROL BOX
AND WATER
LEFT RETURN
CONTROL BOX
LEFT RETURN
AP
CMP
AP
CMP
CP
CP
CP
CP
CONTROL BOX
RIGHT RETURN
TOP VIEW
L or R Return
SIDE VIEW
L or R Return
TOP OR SIDE DISCHARGE
REV 8/16/07
Vertical Dimensions cont.
13-25 Tons