Vertical dimensions, 10 tons, Top discharge – WaterFurnace Envision (XL) User Manual
Page 5: Side discharge, Top view, Side view, Left return right return
ENVISION 7-25 TONS INSTALLATION MANUAL
6
CONTROL BOX
RIGHT RETURN
CONTROL BOX AND WATER
LEFT RETURN
2’ PRIMARY
SERVICE ACCESS
FOR LEFT RETURN
2’ PRIMARY
CONTROL BOX
RIGHT RETURN
SERVICE ACCESS
FOR RIGHT RETURN
2’ SECONDARY
SERVICE ACCESS
CONTROL BOX
AND WATER
LEFT RETURN
TOP DISCHARGE
2’ PRIMARY
SERVICE ACCESS
FOR LEFT RETURN
2’ PRIMARY
SERVICE ACCESS
FOR RIGHT RETURN
2’ SECONDARY
SERVICE ACCESS
SIDE DISCHARGE
56 in
[142.2 cm]
2 in [5.1 cm]
1 in [2.5 cm]
2 in [5.1 cm]
18.1 in [46 cm]
1.8 in [4.6 cm]
56 in
[142.2 cm]
22.6 in
[57.4 cm]
TOP PANEL
COVER
58.1 in [147.6 cm]
61.3 in [155.7 cm]
34.1 in
[86.6 cm]
2.9 in
[7.4 cm]
16.1 in
[40.9 cm]
TOP VIEW
Left or Right Return
SIDE VIEW
Left or Right Return
34.1 in
[86.6 cm]
58.1 in [147.6 cm]
61.3 in [155.8 cm]
21.6 in
[54.9 cm]
18.1 in
[46.0 cm]
1.42 in
[3.6 cm]
16.1 in
[40.9 cm]
2.9 in
[7.4 cm]
15.6 in
[39.6 cm]
12.5 in [31.8 cm]
36.3 in
[92.2 cm]
2.6 in [6.6 cm]
DRAIN CONNECTION
WATER OUT
WATER IN
ELECTRICAL
CONNECTIONS
ELECTRICAL
CONNECTIONS
AIR COILS
34.4 in
[87.4 cm]
4.0 in [10.2 cm]
2.2 in [5.6 cm]
10.1 in [25.7 cm]
2.0 in
[5.1 cm]
2.2 in
[5.6 cm]
7.2 in
[18.3 cm]
LEFT RETURN
RIGHT RETURN
15.6 in
[39.6 cm]
4.0 in [10.2 cm]
2.2 in [5.6 cm]
10.1 in [25.7 cm]
2.2 in
[5.6 cm]
12.5 in [31.8 cm]
36.3 in
[92.2 cm]
2.6 in [6.6 cm]
DRAIN CONNECTION
WATER OUT
WATER IN
AIR COILS
34.4 in
[87.4 cm]
7.2 in
[18.3 cm]
2.0 in
[5.1 cm]
TOP OR SIDE DISCHARGE
Legend
AP = Alternate Service Panel
BP = Blower Service Panel
CP
=
Control
Access
Panel
CMP = Compressor Service Panel
AP
CMP
AP
CMP
CP
CP
CP
CP
REV 2/11/08
Vertical Dimensions
7-10 Tons