Drive shaft and supercharger installation, cont’d – Vortech 2000-2003 Ford Focus Zetec/SVT User Manual
Page 20
![background image](/manuals/743252/20/background.png)
P/N: 4FJ020-010
©2004 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
19APR04 v3.0 Focus(4FJ v3.0)
8
into position locating where the exhaust mani-
fold heat shield and drive shaft will come into
contact. (See Fig. 8-e.)
L.
ZX3 Models Only: Mark the heat shield,
remove the drive assembly and modify the
heat shield to clear the drive assembly. (See
Fig. 8-e.) Using an oversize tube or dowel to
form the heat shield is the easiest method for
modification. (See Fig. 8-g.)
M.
Place the drive assembly back into position.
Loosely install the 10mm x 140mm screws
and 3.56" spacers between the supercharger
mounting plate and the bell housing locations.
The Ø.630 O.D. spacer will be placed in the
forward most, bottom position on the bell
housing. (See Figs. 8-a., Fig. 8-f.)
N.
Loosely install the four 5/16"-18 x .75" flat-
head screws through the secondary mounting
plate into the bearing housing. (See Fig. 8-f.)
O.
Tighten all the drive fasteners in the following
order:
•
Four 5/16"-18 x .75" flathead screws con-
necting the bearing housing to the sec-
ondary plate
8.
DRIVE SHAFT AND SUPERCHARGER INSTALLATION, cont’d
Fig. 8-e
Ø.875" x 3.56" SPACER
COMPOSITE DISK
DRIVE COUPLINGS
4 x 5/16"-18 x 5.25" HXHD
4 x 5/16"-18 x 1.00" HXHD
DRIVE COUPLING HOUSING
Ø.630" x 3.56"
SPACER
10mm x 140mm HARDWARE
DRIVE COUPLINGS
4 x 5/16"-18 x .75" FLATHEADS
Fig. 8-f
AREA TO MODIFY
Fig. 8-g
AREA TO MODIFY