beautypg.com

Chapter 3 installation and wiring – Spectrum Controls 1769sc-HART Modules User Manual

Page 19

background image

User’s Manual 0300217-03 Rev. A

Chapter 3
Installation and Wiring

This chapter explains how to:

 Determine the power requirements for the module

 Avoid electrostatic damage

 Install the module

 Wire the module’s terminal block

 Wire output devices

Section 3.1
Compliance to
European Union
Directives

This product is approved for installation within the European Union and EEA regions. It
has been designed and tested to meet the following directives.

3.1.1 EMC Directive

The 1769sc-OF4IH module is tested to meet Council Directive 89/336/EEC
Electromagnetic Compatibility (EMC) and the following standards, in whole or in part,
documented in a technical construction file:

 EN 50081-2 EMC – Generic Emission Standard, Part 2 - Industrial Environment

 EN 50082-2 EMC – Generic Immunity Standard, Part 2 - Industrial Environment

This product is intended for use in an industrial environment.

3.1.2 Low Voltage Directive

This product is tested to meet Council Directive 73/23/EEC Low Voltage, by applying
the safety requirements of EN 61131-2 Programmable Controllers, Part 2 – Equipment
Requirements and Tests. For specific information required by EN61131-2, see the
appropriate sections in this publication, as well as the following Allen-Bradley
publications:

 Industrial Automation, Wiring and Grounding Guidelines for Noise Immunity,

publication 1770-4.1

 Automation Systems Catalog, publication B113

3.1.3 CE Safety

This product is designed to, and verified compliance with, European Union Safety
Standards:

 EN61131-2
 EN61010-1