beautypg.com

SOR Single Point Ultrasonic Level Switch User Manual

Page 6

background image

6/16

Form 841 (08.13) ©SOR Inc.

Calibration and Functional Test

Units in Hazardous Locations — Prior to calibration, make sure that the
work area is declassifi ed before removing the explosion proof cover to
calibrate the unit. Failure to do so could result in severe personal injury or
substantial property damage.

No calibration is needed. Units are
calibrated at the factory. No user
adjustments are required.

Functional test may be done with or
without a current meter. See

for

wiring configuration. See Figure 8 for
component location.

Connect power to the circuit board

as shown in

.

With a dry sensor, move the Wet

Probe Switch (see

) to 8mA

position. The red LED will light.

The current meter will read l6mA

(±1

mA).

Wet Probe Switch

Yellow

LED

8mA

8mA

16mA

Red LED 16mA

J1 Receive
Jack

J2 Transmit Jack

Apply process liquid to the sensor. The red LED will turn off, and the

yellow LED will light. The current meter will read 8mA (±1 mA).

With liquid still applied to the sensor, move the Wet Probe Switch to the 16mA

position. The yellow LED will turn off, and the red LED will light. The current meter

will read 16mA (±1 mA).

Remove the liquid from the sensor. The red LED will turn off, and the yellow LED will

light. The current meter will read 8mA (±1 mA).

Delay Timer Operation (DT accessory)

Current Output Chart

Yellow

LED (Dry)

Red LED

(Wet)

Current Meter

(+ 1mA)

Sensor Status

Wet Probe

Switch Position

8mA

Wet

8mA

16mA

Dry

8mA

16mA

Wet

16mA

8mA

Dry

16mA

 LED On