beautypg.com

SOR Direct or Remote Mount Explosion Proof UL/CSA/ATEX User Manual

SOR Sensors

background image

Form 416 (01.13) ©SOR Inc.

1/8

These instructions provide information for installation and
field calibration of B Temperature Switches.

Process temperature changes cause proportional
vapor pressure changes in the temperature sensing
bulb that acts on a diaphragm/piston assembly to
actuate and deactuate a snap-action electrical switching
element at discrete process temperatures. The instrument’s
behavior is determined by vapor pressure (105 range model
fill media is inert gas). For best results with the SOR

®

thermal activated temperature switch, the entire probe
must experience the media being monitored. If a
thermowell is being used, a thermal paste is recommended
to ensure the transfer of heat through the well to the probe.

B Temperature Switches

General Instructions

Registered Quality System to ISO 9001

Design and

specifications are

subject to change

without notice.

For latest revision, go to

www.sorinc.com

Table of Contents

Installation .......................................2
SIL Installation ..................................2
Electrical Connection ...........................3
Calibration .......................................3
Dimensions ......................................4
Operation.........................................6
ATEX Marking Information .....................7
Declaration of Conformity .....................8

n and

ing

ment’s

e model

®

be

mended

probe.

NOTE: If you suspect that a product is defective, contact the factory
or the SOR Representative in your area for a return authorization
number (RMA). This product should only be installed by trained
and competent personnel.