SOR 815PT Smart Pressure Transmitter User Manual

Page 2

background image

2/24

Form 1571 (10.13) ©SOR Inc.

2nd Step: Make the Electrical Connection

The electrical connection may be installed on an adequately supported rigid conduit

system. Use suitable locknuts (not provided) when mounting the instrument to an
unthreaded (knockout) hole.

Securely connect the conduit pipe or fitting by holding the flats on the electrical

connection while tightening.



Electrical connection may be rigid or flexible conduit.

Unit in Hazardous Locations - Prior to removal from service, make sure that the
work area is declassifi ed. Failure to do so could result in severe personal injury
or substantial property damage.

Additional Install Steps for “Dual Seal” and “Low Pressure” Units

Failure to follow these additional installation instructions may
diminish the “Ingress Protection” and “NEMA” ratings of the
“Dual Seal” instruments. An improper installation will void
the warranty. Low Pressure refers to 0-5 psi, 0-15 psi, 0-50
psi and 0-100 psi units.

SET SCREW

ANNUNCIATION PATH

NAMEPLATE AREA

EXTERNAL GROUND

PROVISION

Vertical Installation

The figure on the right depicts the vertical

installation profile; with the electrical leads

on top. The instrument may be installed with

the electrical leads on the bottom.

The nameplate (tag) should cover the set

screw (annunciation path). Position the

nameplate slot opposite the set screw;

i.e., the nameplate slot should be located

180° from the set screw.

Horizontal Installation

The following figure depicts the proper horizontal installation profile; with the external

ground provision and set screw (annunciation path) oriented downward.

The nameplate (tag) should not cover the set screw.

Align the nameplate slot with the set screw;

i.e., the set screw

should

be

visible in the

nameplate

slot.

SET SCREW

ANNUNCIATION PATH

NAMEPLATE AREA

EXTERNAL GROUND

PROVISION