6 operation, 1 initial start-up, 2 installation of accessories – Martin Christ Delta 2-24 LSCplus User Manual
Page 38: 3 preparation, 4 switching the freeze-dryer on
Delta 1-24 LSC&
Delta 2-24 LSC&
6 Operation
38
Version 04/2013, Rev. 1.2 of 20/02/2014 • sb
Translation of the original operating manual
Pos: 111 /01 0 Univ ersal mod ule/ Sei tenwe chsel @ 0\ mod _12 021 1624 431 2_0 .docx @ 1 05 @ @ 1
Pos: 112 /20 0 Ch rist/3 60 G T-BA L abo r-Pilot (STANDARDMODU LE)/0 60 Bet rieb/ 060 B etrie b= === == == === == == === == == === == == == === == == == @ 6\m od_ 129 913 739 277 9_68 .docx @ 3 506 2 @ 1 @ 1
6 Operation
Pos: 113 /20 0 Ch rist/3 60 G T-BA L abo r-Pilot (STANDARDMODU LE)/0 60 Bet rieb/ 060 -00 10 E rste I nbe trie bnah me ++ +++ ++ ++ +++ ++ ++ +++ ++ ++ ++ + @ 6 \mo d_1 299 1373 932 48_ 68.d ocx @ 350 70 @ 2 @ 1
6.1 Initial start-up
WARNING
Before the initial start-up, please ensure that your freeze-dryer is properly
set up and installed (see chapter 5 - "Set-up and connection")
Pos: 114 /01 0 Univ ersal mod ule/ Lee rzeile @ 0\ mo d_12 021 162 445 00_ 0.doc x @ 1 14 @ @ 1
Pos: 115 /20 0 Ch rist/3 60 G T-BA L abo r-Pilot (STANDARDMODU LE)/0 60 Bet rieb/ 060 -00 20 Install ation von Zu behö rko mpo nent en +++ ++ ++ +++ ++ ++ +++ ++ ++ + @ 6\mo d_1 299 137 393 670 _68. docx @ 35 079 @ 2 @ 1
6.2 Installation of accessories
The accessories must be completed in accordance with the drying method
that is applied as well as in accordance with the scope of supply.
The installation instructions can be found in a separate document. Please
contact our sales department if you have any queries.
Pos: 116 /01 0 Univ ersal mod ule/ Lee rzeile @ 0\ mo d_12 021 162 445 00_ 0.doc x @ 1 14 @ @ 1
Pos: 117 /20 0 Ch rist/3 60 G T-BA L abo r-Pilot (STANDARDMODU LE)/0 60 Bet rieb/ 060 -00 30 V orb ereit ung ++ +++ ++ ++ +++ ++ ++ +++ ++ ++ ++ +++ ++ ++ ++ @ 6\m od_ 129 913 739 402 9_6 8.docx @ 3 508 6 @ 2 @ 1
6.3 Preparation
The ice condenser chamber must be clean and dry.
• Remove any water residues from the preceding run.
• Close the media drain valve and the aeration valve.
• Ensure that all of the valves of the accessories are closed.
• Switch the vacuum pump on.
Pos: 118 /01 0 Univ ersal mod ule/ Lee rzeile @ 0\ mo d_12 021 162 445 00_ 0.doc x @ 1 14 @ @ 1
Pos: 119 /20 0 Ch rist/3 60 G T-BA L abo r-Pilot (STANDARDMODU LE)/0 60 Bet rieb/ 060 -00 40 Ein schalt en (Haup t- u nd N etzsch alter ) + ++ ++ +++ ++ ++ +++ ++ ++ +++ ++ ++ ++ +++ ++ ++ +++ @ 1 6\m od_1 360 317 135 691 _68. docx @ 80 921 @ 2 @ 1
6.4 Switching the freeze-dryer on
NOTE
The freeze-dryer is equipped with a main switch and a mains power switch
(see chapter 2.1.1 - "Functional and operating elements"). The main
switch establishes the mains power supply and the mains power switch
supplies the control system of the freeze-dryer with power.
• Actuate the main switch
• Actuate the mains power switch.
The LSC
plus
control unit performs a self-test and an initialisation. This may
take several seconds.
• Follow the safety instructions and hazard warnings (see chapter 3 -
"Safety")!
Pos: 120 /01 0 Univ ersal mod ule/ Sei tenwe chsel @ 0\ mod _12 021 1624 431 2_0 .docx @ 1 05 @ @ 1