The welding cycle can be divided into a series of segments: Cycle Start,
Downstroke, Trigger, Weld Pressure 1, Weld Pressure 2, and Hold. In each
of these segments, operator action, rear panel inputs, and process limits can
affect the flow of the process. What follows are examples of how some events
can alter the flow of the welding process, and how they can be identified.
An Uninterrupted Cycle
Figure 6-1 shows the results of a weld process that was not interrupted by
any I/O signal or system error. The setup conditions for this process were
as follows:
• Normal Trigger
• Weld by Time for 50 ms.
• Hold by Time for 1.0 sec.
PART
DOWNSTROKE
DOWNSTROKE
WELD TIME
WELD DIST
WELD ENERGY
HOLD
TOTAL
TOTAL
COUNT
TIME
DIST
PRESSURE 1
PRESSURE 1
PRESSURE 1
TIME
CYCLE TIME
STROKE
35
0.975
1.7921
0.050
0.0023
28.4
1.000
2.025
1.8090
36
0.879
1.7927
0.050
0.0020
28.4
1.000
1.929
1.8092
37
0.877
1.7928
0.050
0.0022
28.4
1.000
1.927
1.8092
Figure 6-1
Data from an Uninterrupted Cycle
Effects of I/O and System Errors
on Process Flow
Page 87
Dukane Manual Part No. 403-575-00
Section 6 - Troubleshooting