The welding cycle can be divided into a series of segments: Cycle Start,

Downstroke, Trigger, Weld Pressure 1, Weld Pressure 2, and Hold. In each

of these segments, operator action, rear panel inputs, and process limits can

affect the flow of the process. What follows are examples of how some events

can alter the flow of the welding process, and how they can be identified.

An Uninterrupted Cycle

Figure 6-1 shows the results of a weld process that was not interrupted by

any I/O signal or system error. The setup conditions for this process were

as follows:

• Normal Trigger
• Weld by Time for 50 ms.
• Hold by Time for 1.0 sec.

PART

DOWNSTROKE

DOWNSTROKE

WELD TIME

WELD DIST

WELD ENERGY

HOLD

TOTAL

TOTAL

COUNT

TIME

DIST

PRESSURE 1

PRESSURE 1

PRESSURE 1

TIME

CYCLE TIME

STROKE

35

0.975

1.7921

0.050

0.0023

28.4

1.000

2.025

1.8090

36

0.879

1.7927

0.050

0.0020

28.4

1.000

1.929

1.8092

37

0.877

1.7928

0.050

0.0022

28.4

1.000

1.927

1.8092

Figure 6-1

Data from an Uninterrupted Cycle

Effects of I/O and System Errors
on Process Flow

Page 87

Dukane Manual Part No. 403-575-00

Section 6 - Troubleshooting