beautypg.com

10 plume management kit, 10 deflector flue terminal kit, 13 plume management kit – Glow-worm Ultracom sxi User Manual

Page 34: 14 deflector flue terminal kit

background image

34

10 Plume Management Kit

10.13 Plume Management Kit

The Plume Management Kit: Part No. A2044100 (white) or

A2044000 (black) can be used to overcome many site issues.
The Plume Management Kit will fit to the Top Horizontal

Telescopic, Rear Horizontal Telescopic and Standard

Horizontal Flue. This enables the flue products to exhaust

further away from the boiler, thereby reducing the impact of

pluming.
NOTE: The flue air inlet can be sited closer to doors, opening

windows and air bricks, than stated in section 4.2, see

diagram 10.27.
The maximum length of the Plume Management Kit must NOT

exceed 6m with a horizontal concentric flue length of 2m max.
For each 90

o

bend or 2 x 45

o

bends the maximum length of the

Plume Management Kit must be reduced by 1m.
For more information contact Glow-worm, refer to page 2.
The Plume Management Kit is supplied with installation

instructions.
Refer to BS5546 or BS6798 for advice on disposal of boiler

condensate.

Diagram 10.27

150mm.

MIN.

12997

10 Deflector Flue Terminal Kit

Diagram 10.28

14465

10.14 Deflector Flue Terminal Kit

The terminal kit fits onto the telescopic and standard

horizontal flue, see diagram 4.1 for kit contents.
The kit is also supplied with installation instructions.
NOTE: The deflector flue terminal kit can be fitted after the

boiler and flue have been installed.
The deflector part of the deflector flue terminal can be rotated

45º to allow pluming away from openings, people, cars,

windows etc., see diagram 10.28.

Should the deflector terminal be positioned under a soffit

or horizontal surface, it is allowed to project the flue

600mm from the wall, to allow the discharge of flue gases

produced into free air.

IMPORTANT: Do not fit the deflector flue terminal with the

deflector positioned downwards.