Rev-A-Shelf 4WV-Series User Manual
20 min, Woven basket installation instructions, Part list

WOVEN BASKET INSTALLATION INSTRUCTIONS
ESTIMATED ASSEMBLY TIME:
20 MIN
CARE AND MAINTENANCE:
Clean basket and wood frame with a damp cloth and wipe parts
dry. machine wash liner in cold water with like colors.
2409 Plantside Dr., Jeffersontown, KY 40299
800.626.1126
www.rev-a-shelf.com
TOOLS REQUIRED:
1)
Measure the inside cabinet width (ICW) at desired height for wood rails.
2)
Measure the width of basket wood frame (BW).
3)
Subtract BW from ICW. Divide answer by 2. Subtract 1/16” from answer.
This will give you the dimension needed from bottom of groove to back of wood
rail (ICW-BW) ÷ 2 - 1/16”.
4)
Cut wood rails per steps 1-3.
5)
Place first cut rail in cabinet with front of rail against back of face frame (for
frameless cabinets, flush with front of cabinet.) at desired height. Secure the front
hole with proper size screw. (Screws not included due to variant in cabinet wall
thicknesses) (Make sure screw does not go through outside wall of cabinet).
Part list:
NOTE: SCREWS NOT INCLUDED DUE TO VARIANT SIZES IN CABINETS
(ICW-BW) ÷ 2 - 1/16”
Desired Height
of Rail
Inside
Cabinet
Width
(ICW)
Basket
Width
(BW)
Bottom of groove
Back of w
ood r
ail
8)
Install second rail on opposite side of cabinet per steps 5-6 at height
location from step 7.
7)
Measure from floor of cabinet to bottom of installed rail.
6)
Make sure rail is level, then secure to cabinet with screws at
remaining hole locations.
9)
Slide in basket.
I-4WV-TRI-1013
Bottom of
rail to floor of
cabinet