beautypg.com

Caution, Installation, Facility plumbing instructions – Oakworks Clodagh Libra User Manual

Page 7

background image

4

The table comes completely assembled and ready to use. Plug the cord into a functioning GFCI outlet that

is rated for the table.

Arrange the power cord and foot switch so that they will not create a tripping hazard. Place the controls in a

safe location where they are convenient and accessible. Keep the controls out of the way of all table mecha-

nisms.

If your table was ordered with the optional faucet & drain, please review typical installation instructions in

the section below.

INSTallaTIoN

faCIlITy PlUMbING INSTrUCTIoNS

CaUTIoN

When installed in the United States, the plumbing of this table must meet the requirements of

any applicable state or local codes. Plumbing rough in and final hook up should be performed

by a qualified plumber and approved by a local building/plumbing inspector.

Customer Supplied Parts list:

1. (2) 20” long flexible braided water supply lines with 3/8” male end foot bath faucet connection
2. (2) Shut off valves for Facility Hot/Cold water supply connection
3. (2) 1.5” PVC adapters
4. (1) 1.5” Flexible drain line for Facility DWV system connection.

Facility Connection Requirements:

1. An existing below floor plumbing trap and flexible drain line connection to the Libra table located on floor as

detailed by illustration shown in these instructions.
2. Hot and cold water supply with braided flexible supply lines that will interface to a 3/8” female compression fit-
ting. (supplied on the Libra table)

Procedure:

a. The print below shows the details of where the plumbing rough-in locations under table are required to be posi-

tioned for proper installation.

b. Customer to provide flexible 3/8” braided water supply lines of at least 20” in length for interfacing to facilities

hot and cold water supply located on the floor beneath the table as shown in the above picture.