Oakworks Paper Roll Holder for Treatment Tables User Manual
Powerline & seychelle, Paper roll holder installation, Akworks
Use masking tape to mark 2”
drilling depth.
Step 1
O
AKWORKS
®
PowerLine & Seychelle
paper roll holder
bracket (2)
screws (2)
wooden dowel (1)
R
Toll Free: 800.558.8850 Phone: 717.235.6807 www.oakworks.com
PAPER ROLL HOLDER INSTALLATION
Items required:
7/32” Dia. standard drill bit
Hand
drill
Masking
tape
Ruler
5/32” or 4mm Hex Key Wrench
Part no.MMINML0013 rev. O.18.10
2”
After table is set-up, select
position for first bracket to
be installed on the outside of
table leg on foot end of table.
Step 2
Slide bracket along bottom
edge of table side frame until
it meets with the existing bolt
head. Ensure the dowel rod
seat on the bracket is facing
inwards.
Step 3
Holding the bracket firmly,
drill the bracket mounting
hole until the masking tape
reaches the bracket.
Step 4
Using the supplied screw & your hex
key wrench, secure the paper roll holder
bracket into place. Repeat steps 3 thru 5 on
the other side of table.
Step 5
Part #61624 – Oakworks Paper Roll Holder Kit
Locate the wooden dowel & feed it thru
your paper roll. Place one end of the
wooden dowel in the hole located in the
paper roll holder bracket.
Step 6
To secure the wooden dowel on the
other side, pull out the paper roll
holder bracket slightly & insert the
wooden dowel into the hole.
Step 7