START-UP CHECKLIST

(Remove and Store in Job File)

I. PRELIMINARY INFORMATION

MODEL NO.:

DATE:

SERIAL NO.:

TECHNICIAN:

II. PRE-START-UP (insert checkmark in box as each item is completed)

Ⅺ VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
Ⅺ REMOVE ALL SHIPPING HOLDDOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS

Ⅺ VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
Ⅺ CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
Ⅺ CHECK THAT INDOOR AIR FILTER IS CLEAN AND IN PLACE
Ⅺ VERIFY THAT UNIT INSTALLATION IS LEVEL
Ⅺ CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW

TIGHTNESS

III. START-UP

ELECTRICAL

SUPPLY VOLTAGE

L1-L2

L2-L3

L3-L1

COMPRESSOR AMPS

L1

L2

L3

INDOOR FAN AMPS

TEMPERATURES

OUTDOOR-AIR TEMPERATURE

DB

RETURN-AIR TEMPERATURE

DB

WB

COOLING SUPPLY AIR

PRESSURES

REFRIGERANT SUCTION

PSIG

REFRIGERANT DISCHARGE

PSIG

Ⅺ VERIFY THAT 3-PHASE SCROLL COMPRESSOR (50SS048,060; 50SX036-060 UNITS ONLY) IS ROTATING

IN CORRECT DIRECTION

Ⅺ VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS ON PAGES 28-33.

----------------------------------------------------------------------------------------

CUT

ALONG

DOTTED

LINE

Copyright 1995 Carrier Corporation

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book 1

4

Tab

1b 6b

PC 111

Catalog No. 535-022

Printed in U.S.A.

Form 50SS,SX-4SI

Pg CL-1

5-95

Replaces: 50SS,SX-3SI

This manual is related to the following products: