AERCO KC1000 Low NOx Boiler equipped with C-More version 3.04 User Manual
Page 3

CONTENTS
GF-109LN - THE AERCO KC1000 GAS FIRED LOW NOx BOILER
Operating & Maintenance Instructions
FOREWARD A
SECTION 1 – SAFETY PRECAUTIONS
1-1
Para. Subject Page
1.1
Warnings & Cautions
1-1
1.2 Emergency
Shutdown
1-2
Para.
Subject Page
1.3 Prolonged
Shutdown
1-2
SECTION 2 – INSTALLATION PROCEDURES
2-1
Para. Subject Page
2.1
Receiving the Unit
2-1
2.2 Unpacking
2-1
2.3 Installation
2-2
2.4 Gas
Supply
Piping
2-4
2.5 Electrical
Supply
2-6
2.6
Mode of Operation and Field
Control Wiring
2-6
Para.
Subject Page
2.7
I/O Box Connections
2-8
2.8
Auxiliary Relay Contacts
2-10
2.9
Flue Gas Vent Installation
2-10
2.10 Combustion
Air
2-10
SECTION 3 – CONTROL PANEL OPERATING PROCEDURES
3-1
Para. Subject Page
3.1 Introduction
3-1
3.2
Control Panel Description
3-1
3.3 Control
Panel
Menus
3-3
3.4 Operating
Menu
3-4
3.5 Setup
Menu
3-4
Para.
Subject Page
3.6 Configuration
Menu
3-5
3.7 Tuning
Menu
3-7
3.8 Start
Sequence
3-8
3.9 Start/Stop
Levels
3-9
SECTION 4 – INITIAL START-UP
4-1
Para. Subject Page
4.1
Initial Startup Requirements
4-1
4.2
Tools and Instrumentation for
Combustion Calibration
4-1
4.3
Natural Gas Combustion
Calibration
4-2
Para.
Subject Page
4.4
Propane Combustion Calibration
4-5
4.5 Unit
Reassembly
4-8
4.6
Over-Temperature Limit Switch
Adjustments
4-8
Section 5 – MODE OF OPERATION
5-1
Para. Subject Page
5.1 Introduction
5-1
5.2
Indoor/Outdoor Reset Mode
5-1
5.3
Constant Setpoint Mode
5-2
5.4
Remote Setpoint Modes
5-2
5.5 Direct
Drive
Modes
5-3
Para.
Subject Page
5.6 Boiler
Management
System
(BMS)
5-4
5.7
Combination Control System
(CCS)
5-5
i