AERCO KC1000 Boiler equipped with C-More 2002 User Manual
Page 3

CONTENTS
i
GF-109 - THE AERCO KC1000 GAS FIRED BOILER
Operating & Maintenance Instructions
FOREWARD
A
SECTION 1 – SAFETY PRECAUTIONS
1-1
Para.
Subject
Page
1.1
Warnings & Cautions
1-1
1.2
Emergency Shutdown
1-2
Para.
Subject
Page
1.3
Prolonged Shutdown
1-2
SECTION 2 – INSTALLATION PROCEDURES
2-1
Para.
Subject
Page
2.1
Receiving the Unit
2-1
2.2
Unpacking
2-1
2.3
Installation
2-2
2.4
Gas Supply Piping
2-4
2.5
Electrical Supply
2-5
2.6
Mode of Operation and Field
Control Wiring
2-6
Para.
Subject
Page
2.7
I/O Box Connections
2-8
2.8
Auxiliary Relay Contacts
2-10
2.9
Flue Gas Vent Installation
2-10
2.10
Combustion Air
2-10
SECTION 3 – CONTROL PANEL OPERATING PROCEDURES
3-1
Para.
Subject
Page
3.1
Introduction
3-1
3.2
Control Panel Description
3-1
3.3
Control Panel Menus
3-3
3.4
Operating Menu
3-4
3.5
Setup Menu
3-4
Para.
Subject
Page
3.6
Configuration Menu
3-5
3.7
Tuning Menu
3-6
3.8
Start Sequence
3-7
3.9
Start/Stop Levels
3-9
SECTION 4 – INITIAL START-UP
4-1
Para.
Subject
Page
4.1
Initial Startup Requirements
4-1
4.2
Tools and Instrumentation for
Combustion Calibration
4-1
4.3
Combustion Calibration
4-2
Para.
Subject
Page
4.4
Propane Combustion Calibration
4-5
4.5
Unit Reassembly
4-6
4.6
Over-Temperature Limit Switch
Adjustments
4-6
Section 5 – MODE OF OPERATION
5-1
Para.
Subject
Page
5.1
Introduction
5-1
5.2
Indoor/Outdoor Reset Mode
5-1
5.3
Constant Setpoint Mode
5-2
5.4
Remote Setpoint Modes
5-2
5.5
Direct Drive Modes
5-3
Para.
Subject
Page
5.6
Boiler Management System
(BMS)
5-4
5.7
Combination Control System
(CCS)
5-5