beautypg.com

2 connection and installation, Installing the sj-f031/036, Connecting the ground lead – KEYENCE SJ-F036 User Manual

Page 4: Connecting the power supply, Connection and installation

background image

4

2-2

Connection and Installation

Installing the SJ-F031/036

Install the SJ-F031/036 at locations where static electricity is generated or is likely to be generated.

Installing the Static Elimination Blower

There are two ways of installing the Static Elimination Blower, with or without the mounting fixtures.
Each installation method is shown below.

When using the accessory mounting fixture

1

Tap M4 screw holes where the Static Elimination Blower is to be installed, and fasten the OP-
84374 mounting fixture with M4 screws.
You can adjust the horizontal angle of the Static Elimination Blower by using the semi-circled cutout
holes on the base of the mounting fixture.
M4 screws for fastening the mounting fixture at the installation location must be provided separately.

2

Install the Static Elimination Blower on the mounting fixture.
You can adjust the vertical angle of the Static Elimination Blower by using the semi-circled cutout holes
on the base of the mounting fixture.
M4 screws for fastening the mounting fixture to the Static Elimination Blower are provided with the
mounting fixture.

When using the accessory mounting fixture, also fasten it with screws as shown above.

M4 screws

START

/STOP

BALANCE

ION

FAN

COND

IONLEVEL

1

1

M4 screws

M4 screws

Tip

2-2

Connection and Installation

When using the OP-78477 ceiling-mounting fixtures

1

Install the OP-78477 ceiling-mounting fixtures on the Static Elimination Blower.
M4 screws for fastening the Static Elimination Blower to the ceiling-mounting fixtures are provided
together.

2

Tap M4 screw holes where the Static Elimination Blower is to be installed, and fasten the ceiling-
mounting fixtures with M4 screws.
M4 screws for fastening the ceiling-mounting fixtures to the installation location must be provided
separately.

3

Loosen the screws mounted on the Static Elimination Blower, and adjust the installation angle.
Then, fasten with the screws again.

When mounting fixtures are not used

Drill holes of diameter 4.2 mm or more at the location where the Static Elimination Blower is to be
installed, and fasten with M4 screws.
M4 screws must be provided separately.

START

/STOP

BALANCE

ION

FAN

COND

IONLEVEL

1

1

M4 screws

M4 screws

START

/STOP

M4 screws

START

/STOP

START

/STOP

M4 screws

M4 screws

2-2

Connection and Installation

Connecting the ground lead

After installation, connect the ground lead in any of the following methods.

When using the ground terminal

Connect the supplied ground lead to the ground terminal on the rear of the blower unit and then
connect it to ground.

Limit the tightening torque to 0.3 Nm or less.

When using the I/O cable

Connect the I/O cable to the I/O cable connector and then connect the ground lead (thick black wire) to
ground.

DCIN

Ground terminal

Note

2-2

Connection and Installation

Connecting the Power Supply

Connect the power supply according to one of the following methods.

AC adapter (SJ-U2)

1

Connect the AC adapter to the DC IN connector on the rear of the blower unit.

2

Connect the power supply cable to the AC adapter.

3

Insert the plug of the AC adapter into the wall outlet.

To prevent electric shock and to ensure accurate static elimination, be sure to
establish a Class D ground by using the grounding terminal or the I/O cable on
the rear of the blower unit.

24 VDC power supply

1

Connect the wires of the I/O cable according to the description of "I/O cable" on page 3.

To prevent electric shock and to ensure accurate static elimination, be sure

to connect the ground lead to a Class D ground.

For a power supply, be sure to use a DC power supply with a rating of 24 V

with enough capacity.

2

Connect the I/O cable connector to the SJ-F031/036.

WARNING

WARNING

This manual is related to the following products: