Assembly after a complete tear down – Cub Cadet G730 User Manual
Page 38
If the unit has been torn down completely, the
following summary identifies the assembly pro-
cedures necessary to completely assemble the
unit. Each assembly procedure is located by a
page reference.
The part reference numbers provided in each
assembly procedure are keyed to the individual
exploded views, and are also keyed to the com-
plete unit exploded view on page 38-39.
1. Install the axle shaft (main housing). See
page 34-35.
2. Install the hydraulic components. See pages
29-33.
3. Install the bypass rod and arm. See page
28.
4. Install the input shaft. See page 27.
5. Install the charge pump. See page 26.
6. Install the reduction gears, pinion gear and
bull gear. See page 25.
7. Install the axle shaft into side housing. See
page 23-24.
Figure 29, Sealant Application Diagram
ASSEMBLY AFTER A COMPLETE TEAR DOWN
8. Apply sealant to the main housing and cen-
ter section prior to installing the side cover.
See diagram below.
NOTE: Prior to applying the new sealant, the
old sealant must be removed from all
surfaces.
A small consistent bead (approx.
1/16 – 1/8 inch) of the sealant around
the housing face will be sufficient. Use
sparingly.
The illustration below indicates the cor-
rect sealant path.
9. Install side housing. See page 22.
10. Install brake assembly. See page 17.
11. Install new oil filter and fill the transaxle with
new oil. See pages 10 and 11.
12. Install the control arm/RTN assembly. See
pages 13-16.
13. Install the transaxle onto the vehicle.
14. Perform the purge procedures listed on
page 12.
36 G730
Sealant Path for Main Housing
Sealant Path for Center Section