WEATHER GUARD Model 250 Sliding Ladder Rack User Manual
Installation manual, Sliding ladder rack, Van storage solutions
1
INSTALLATION MANUAL
SLIDING LADDER RACK
Model 250
ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS
BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT.
WARNING
WWW.WEATHERGUARD.COM
VAN STORAGE SOLUTIONS
CAUTION
FOR THE WAY YOU WORK
TM
PRODUCT REGISTRATION
Model# ______250______________ Serial#__________________________
Purchased Date:
____________________________
Place of purchase:
____________________________
Key Code:
____________________________
24-0208
Part No. 24-0208 REV. B ECN 5305 04/13
NOTE: This product is only intended for
use inside a van, enclosed trailer or truck
with metal cap.
Weather Guard recommends the Model 250 sliding ladder rack be installed in service or delivery vans equipped
with a bulkhead. A bulkhead divider between cargo and driver/passenger compartment reduces the likelihood
material will come forward and cause personal injury during a vehicle accident.
To reduce the risk of serious personal injury from the ladder falling or becoming a projectile during hard braking or a
vehicle accident:
• Read and follow all instructions and warnings before installing or using this product.
• The sliding ladder rack should only be used for transporting ladders. Never modify or use the sliding ladder
rack for any other purpose.
• Rack must be installed per instructions.
• Only mount the sliding ladder rack in a van, enclosed trailer, or metal truck cap.
• Maximum ladder weight should not exceed 80 lbs.
• When using power tools, follow tool manufacturer’s warnings and instructions.
• Protect your eyes. Wear safety goggles that comply with ANSI Z87.1 (or in Canada, CSA Z94-3-M88) as
shown on package.
• Never install the sliding ladder rack system inside passenger compartments.
• Check for electrical wiring in areas where holes are to be drilled. Consult the vehicle’s shop manual for
wiring paths.
INSTALLATION TIME
Approximate installation time: 60 minutes per unit (1 hour) depending on van equipment installation experience
. Rail assembly
installation requires 2 people.