System Setup and Operation (continued)

Setup

1. With the power switch in the OFF position, plug the AC power cord into

the power input port on the back of the unit and then into a grounded
receptacle.

2. Plug a light guide with appropriate adapter installed into the light exit

socket.

Note: The light guide is fully inserted when the light guide spring snaps
into the groove cut into the socket.

3. Turn the power switch ON and wait 15 seconds for the lamp to complete

the warm-up cycle.

Note: If the power has just been turned OFF, allow 15 seconds for
complete

discharge

before

turning

ON

again.

4. Set the light intensity to the desired level by turning the Light Intensity

Control Knob.