Regulations main safety inspection, Regulations general safety inspection – Vetter SP 60 User Manual
Page 21
Page 20/30
Regulations Main safety inspection
Serial number:
Year of construction:
Inspection due on:
5th Year
8th Year
13th Year
Disposal after 15 years
In order to carry out this inspection, the specialist must meet the
conditions stipulated in the preliminary remarks contained in
GUV-G 9102 including additional training by the manufacturer or
an authorized trainer.
For information concerning training courses at our company ple-
ase contact: [email protected] or call us at:
+49 (0) 2252/3008-0
Further information about the Vetter Academy can be found on
our website: www.vetter.de!
Regulations General safety inspection
Serial number:
Year of construction:
Inspection due on:
10th Year
Disposal after 15 years
This inspection is to be exclusively carried out by the ma-
nufacturer!
Arrange an inspection date with the manufacturer in good time.
5
8
13
10
15
15