Regulations annual inspection – Vetter SP 60 User Manual
Page 19
![background image](/manuals/641033/19/background.png)
Page 18/30
Regulations Annual inspection
and after each period of use
Serial number:
Year of construction:
Inspection due
1st Year
2nd Year
3rd Year
4th Year
6th Year
7th Year
9th Year
11th Year
12th Year
14th Year
Disposal after 15 years
In order to carry out this inspection, the inspector must have the
corresponding qualifications according to GUV-G 9102.
The execution and results of the inspection are to be recorded in
writing. This is made by:
9
Filling out an inspection report (see attachment)
9
Entry into the inspection log book
9
Direct entry on the safety cushion itself (only once annually)
Testing instructions for the inspection after each period
of use without loading by a falling object
1. Visual inspection of the cleaned safety cushion for externally
recognizable damage in the inflated condition.
Testing instructions for the inspection after each period
of use with loading by a falling object or under operati-
on conditions by a person being rescued
1. Visual inspection of the cleaned safety cushion for externally
recognizable damage in the deflated condition (upper and lo-
wer cover)
2. Inflate the safety cushion
1
2
3
4
6
7
9
11
12
14
15