beautypg.com

Great Plains SML1000 Operator Manual User Manual

Page 3

background image

Great Plains Manufacturing, Inc.

Cover

Index

iii

03/31/2011

Cover

Index

407-451M

©

Copyright 2007, 2010, 2011. All rights Reserved

Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed for
damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products as
it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.

Trademarks of Great Plains Manufacturing, Inc. include: Singulator Plus, Swath Command, Terra-Tine.

Registered Trademarks of Great Plains Manufacturing, Inc. include:

Air-Pro, Clear-Shot, Great Plains, Land Pride, MeterCone, Nutri-Pro, Seed-Lok, Solid Stand, Whirlfilter, Yield-Pro.

Brand and Product Names that appear and are owned by others are trademarks of their respective owners.

Printed in the United States of America

Table of Contents

Important Safety Information ......................................1
Safety Decals .................................................................5
Introduction ..................................................................7
Models Covered .............................................................7
Description of Unit ..........................................................7

Intended Usage ..........................................................7
Compatible Materials..................................................8
Serial Number Plates..................................................8
Document Family........................................................9

Using This Manual..........................................................9

Definitions...................................................................9

Owner Assistance ..........................................................9
Preparation and Setup ...............................................10
Initial Setup...................................................................10
Post-Delivery/Seasonal Setup......................................10
Pre-Planting Setup .......................................................10
Hitching Cart to Implement...........................................11

Shims .......................................................................11
Open Implement Hitches ..........................................12
Hitch Cart and Implement.........................................12
Double-Check Latch Plates ......................................13

Make Fertilizer Connection...........................................13
Parking Stands .............................................................14

Raise Stand After Hitching .......................................14
Lower Stand for Unhitching ......................................14

Operating Instructions...............................................15
Pre-Start Checklist .......................................................15
Transporting the Cart ...................................................16

Transport Checklist...................................................16

Walkboard and Ladder .................................................17

Ladder Operation .....................................................17

Loading Materials .........................................................18

Filling by Either Method ............................................18

Sight Gauge Scale Metric Equivalents .................18

Tank Quick-Fill..........................................................19
Tank Lid Fill ..............................................................19

Tank Field Operation....................................................20

Field Start-Up ...........................................................20

Planting .................................................................... 20
Material Run-Out...................................................... 20

Field Set-Up Checklists................................................ 21
Field Operation ............................................................ 21
Short-Term Stopping.................................................... 22
Short-Term Parking...................................................... 22
Long-Term Storage ...................................................... 22
Troubleshooting......................................................... 23
Maintenance and Lubrication ................................... 25
Maintenance ................................................................ 25
Material Clean-Out ....................................................... 26

Material Recovery .................................................... 26
Excess Application ................................................... 26
System Flush ........................................................... 26
Pump Preservation................................................... 26
Cart Inlet Strainer ..................................................... 27

Filter Removal ...................................................... 27
Filter Cleaning ...................................................... 27

Lubrication and Scheduled Maintenance ..................... 28
Appendix A - Reference Information........................ 30
Specifications and Capacities ...................................... 30

SML-1000, SML-750, SML-500 Fertilizer Carts ....... 30

Tire Inflation Chart ....................................................... 30
Torque Values Chart .................................................... 31
Plumbing Diagrams...................................................... 32

SML-1000 Gallon Cart Plumbing ............................. 32
SML-750 Gallon Cart Plumbing ............................... 33
SML-500 Gallon Cart Plumbing ............................... 34

Appendix B - Pre-Delivery ......................................... 35
Appendix C - Initial Setup ......................................... 40
Remove Pintle Hitch .................................................... 40
Install Quick Hitches .................................................... 40

Mount Boom Inlet ..................................................... 41
Install Hitch Latches ................................................. 41

Check Handrail Fill ....................................................... 41
Index............................................................................ 43

This manual is related to the following products: