beautypg.com

Field set-up checklists, Field operation, Field set-up checklists field operation – Great Plains SML1000 Operator Manual User Manual

Page 25

background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

21

03/31/2011

Table of Contents

Index

407-451M

Field Set-Up Checklists

Use the following tables, and the checklists in your imple-
ment Operator

a

and Seed Rate

b

manual to develop a

final checklist for your tractor/implement/cart configura-
tion. Additional or fewer steps may be necessary
depending on tractor features, implement options and
planting accessories.

Null4:

Null4:

Null4:

Null4:

Field Operation

Perform all steps in “Pre-Start Checklist” on page 15
and “Field Set-Up Checklists” on page 21.

Null4:

Null4:

Null4:
Null4:

Null4:

a. See planter or air drill implement Operator manual.
b. Topic covered in Seed Rate manual. See “Document Family” on page 9 for a list of Rate manuals.

Implement Checklist

Page

Basic implement checklist completed

a

Boom system checklist completed

a

Mechanical Checklist

Page

Cart hitched. Hitch latch plates pinned

11

Tank lid and breather insert secure

19

Ladder raised and pinned

17

Plumbing Checklist

Page

Inspect hoses and fittings for leaks

Cart inlet valve - CLOSED

18

Tank discharge valve - OPEN

18

Implement inlet valve - OPEN

a

Cart outlet valve - OPEN

18

Prime pump

20

Treatments Checklist

Page

Material depletion rate estimated

First Pass Operation Checklist

Page

1. Complete implement pass 1 checklist

a

2. If cart has a fertilizer system integrated

with the DICKEY-john seed monitor,
set the “Fert.Pump” switch on the
Clutch Folding Module to ON.

a

3. Pull forward, lower implement, and

begin planting.

a

4. Check boom manifold pressure gauge

b

Suspending Planting Checklist

Page

1. Stop tractor. Set brakes.

2. Complete implement Suspend Plant-

ing checklist

a

3. If cart has a fertilizer system integrated

with the DICKEY-john seed monitor,
set the “Fert.Pump” switch on the
Clutch Folding Module to OFF.

a

4. Cart outlet valve CLOSED.

32 or 33

Material Re-Load Checklist

Page

1. Perform Suspending checklist.

above

2. Check fertilizer level whenever re-load-

ing seed.

3. Check fertilizer level prior to expected

time or distance of fertilizer depletion.

4. When reloading seed and fertilizer,

check consumption against anticipated
use to that point.

Ending Planting Checklist

Page

1. Suspend operations as above, then

2. Implement inlet valve CLOSED

a

3. Tank discharge valve CLOSED

32 or 33

4. Perform a material clean-out to pre-

serve pump as soon as possible.

26

This manual is related to the following products: