Field set-up checklists, Field operation, Field set-up checklists field operation – Great Plains SML1000 Operator Manual User Manual
Page 25

Great Plains Manufacturing, Inc.
Operating Instructions
21
03/31/2011
407-451M
Field Set-Up Checklists
Use the following tables, and the checklists in your imple-
ment Operator
a
and Seed Rate
b
manual to develop a
final checklist for your tractor/implement/cart configura-
tion. Additional or fewer steps may be necessary
depending on tractor features, implement options and
planting accessories.
Null4:
Null4:
Null4:
Null4:
Field Operation
Perform all steps in “Pre-Start Checklist” on page 15
and “Field Set-Up Checklists” on page 21.
Null4:
Null4:
Null4:
Null4:
Null4:
a. See planter or air drill implement Operator manual.
b. Topic covered in Seed Rate manual. See “Document Family” on page 9 for a list of Rate manuals.
Implement Checklist
Page
Basic implement checklist completed
Boom system checklist completed
Mechanical Checklist
Page
Cart hitched. Hitch latch plates pinned
Tank lid and breather insert secure
Ladder raised and pinned
Plumbing Checklist
Page
Inspect hoses and fittings for leaks
Cart inlet valve - CLOSED
Tank discharge valve - OPEN
Implement inlet valve - OPEN
Cart outlet valve - OPEN
Prime pump
Treatments Checklist
Page
Material depletion rate estimated
First Pass Operation Checklist
Page
1. Complete implement pass 1 checklist
2. If cart has a fertilizer system integrated
with the DICKEY-john seed monitor,
set the “Fert.Pump” switch on the
Clutch Folding Module to ON.
3. Pull forward, lower implement, and
begin planting.
4. Check boom manifold pressure gauge
Suspending Planting Checklist
Page
1. Stop tractor. Set brakes.
2. Complete implement Suspend Plant-
ing checklist
3. If cart has a fertilizer system integrated
with the DICKEY-john seed monitor,
set the “Fert.Pump” switch on the
Clutch Folding Module to OFF.
4. Cart outlet valve CLOSED.
Material Re-Load Checklist
Page
1. Perform Suspending checklist.
above
2. Check fertilizer level whenever re-load-
ing seed.
3. Check fertilizer level prior to expected
time or distance of fertilizer depletion.
4. When reloading seed and fertilizer,
check consumption against anticipated
use to that point.
Ending Planting Checklist
Page
1. Suspend operations as above, then
2. Implement inlet valve CLOSED
3. Tank discharge valve CLOSED
4. Perform a material clean-out to pre-
serve pump as soon as possible.