Operating instructions, Pre-start checklist, Operating instructions pre-start checklist – Great Plains SML1000 Operator Manual User Manual
Page 19

03/31/2011
407-451M
Great Plains Manufacturing, Inc.
15
Operating Instructions
This section covers general operating procedures. Expe-
rience, machine familiarity, and the following information
will lead to efficient operation and good working habits.
Always operate farm machinery with safety in mind.
Pre-Start Checklist
Perform the following steps before transporting the fertil-
izer cart cart to the field.
❑ Carefully read “Important Safety Information” on
❑ Inspect all hoses, tubing and fittings for holes,
cracks, excess wear and any other signs of possible
leaks.
❑ Lubricate cart as indicated under “Lubrication and
Scheduled Maintenance” on page 28.
❑ Check all tires for proper inflation. See “Tire Infla-
❑ Check all bolts, pins, and fasteners. Torque as
shown in “Torque Values Chart” on page 31.
❑ Check cart for other worn or damaged parts. Repair
or replace parts before going to the field.
❑ Review inlet filter cleaning history. Clean filter if due
❑ Ensure that the implement is set up for the material
and application rate desired. See the Seed Rate
manual for the implement. Setup items commonly
include:
• boom drop line orifice plates
• pump rate setting
• pump strainer check
• relief valve check and set
❑ Determine how long (in time or area) it will take to
exhaust the material in the tank at the desired rate.
This information is important both to ensure correct
application rate, and to avoid running a dry pump at
material run-out.