beautypg.com

Testing the control functions, Step seven, Push test button – tekmar 365 Mixing Control User Manual

Page 13

background image

Copyright © D 365 - 06/00

13 of 16

Indicator lights

There are fourteen LEDs on the front of the control that will aid in testing and troubleshooting. During normal operation, these lights
indicate the following functions:

Power light on

• the 120 Vac power supply has been connected and the control is energized.

Heat Demand light on

• the control is receiving a 24 or 120 Vac external heat demand signal at terminals

Heat Dem — Heat Dem

(1 and 2) or from a 10K Zone Control

or the heat demand selector switch is in the "Permanent Heat

Demand " position.

WWSD light on

• the control has calculated that the outdoor temperature is warm enough to not require heat.

Unoccupied light on

• the terminals

Uno Sw —Com Sen (13 and 14) are shorted together, switching the control into the

Unoccupied (setback) mode.

Min. Return light on

• the control is operating the mixing valve (4-20 mA) or variable speed pump (Var Pmp) to satisfy the

minimum boiler return temperature requirement.

Max. or Setpoint light on • the control is operating the mixing valve (4-20 mA) or variable speed pump (Var Pmp) to prevent

maximum supply temperature overshoot, or the control is operating in the setpoint mode.

Boiler light on

• the boiler relay is on, closing the contacts between the

Boiler (8 and 9) terminals.

Pump light on

• the system pump relay is on, closing the contacts between the

System Pmp (5 and 6) terminals.

% of full output lights on • the control is displaying the output level of both the 4-20 mA output (from terminals 10 and 11) and the

Variable Speed Pump output (from terminals 3 and 7) in incremental % levels.

Test light on

• the control is going through the programmed test routine.

Step Seven

Operational test of control functions - Test button

Testing the Control Functions

Test button

When the settings are made and the terminal plugs firmly seated, power up the control. For approximately 5 seconds, all the red
LED status lights and the yellow "% of full output" lights are turned on. If a fault in a sensor exists, the LED lights will flash an error
message until the fault is located and corrected. The error messages are listed on page 15.

If there are no flashing error messages, the control will enter the operating mode. To initiate the test routine, press the Test button.

All lights on (except Pump, Boiler)

Test Starts

Power-up for 5 seconds

90

70

50

30

10

Power

WWSD

UnOcc.
Switch

Min.
Return

Boiler

Heat
Demand

Max. or
Setpoint

Pump

%

of full

output

Test

90

70

50

30

10

Power

WWSD

UnOcc.
Switch

Min.
Return

Boiler

Heat
Demand

Max. or
Setpoint

Pump

%

of full

output

Test

Push Test Button

90

70

50

30

10

Power

WWSD

UnOcc.
Switch

Min.
Return

Boiler

Heat
Demand

Max. or
Setpoint

Pump

%

of full

output

Test

Power light on — Test light on — all "% of full output" lights on — System pump on

Once 100% output on the 4-20 mA and variable speed injection pump has been reached,
the control will then begin to ramp down the output and turn the system pump on.

During this 10 second step,

if there is a heat demand signal, and the Test button is

pressed once, the test routine will be halted and the system pump will remain on. The
"Test" light will flash, and the control will be held in a pause mode for 5 minutes, after
which time it will automatically exit the test routine and cycle into normal operating mode.
Pushing the Test button during the 5 minute pause will allow the control to resume the
test routine at the next step.

Power light on — Test light on — Increasing "% of full output" lights on

The control ramps the variable speed pump and the 4-20 mA output
up to 100% together, in the time set by the "Motor Speed/ Pump
Response" dial.

If the Test Button is pushed once during this step, the "Test" light will
flash and the control will be held in a pause mode for 5 minutes, after
which time it will automatically exit the test routine and return to
normal operating mode. Pushing the Test button during the 5 minute
pause will allow the control to resume the test routine at the next step.

90

70

50

30

10

Power

WWSD

UnOcc.
Switch

Min.
Return

Boiler

Heat
Demand

Max. or
Setpoint

Pump

%

of full

output

Test

90

70

50

30

10

Power

WWSD

UnOcc.
Switch

Min.
Return

Boiler

Heat
Demand

Max. or
Setpoint

Pump

%

of full

output

Test

90

70

50

30

10

Power

WWSD

UnOcc.
Switch

Min.
Return

Boiler

Heat
Demand

Max. or
Setpoint

Pump

%

of full

output

Test

90

70

50

30

10

Power

WWSD

UnOcc.
Switch

Min.
Return

Boiler

Heat
Demand

Max. or
Setpoint

Pump

%

of full

output

Test

90

70

50

30

10

Power

WWSD

UnOcc.
Switch

Min.
Return

Boiler

Heat
Demand

Max. or
Setpoint

Pump

%

of full

output

Test

90

70

50

30

10

Power

WWSD

UnOcc.
Switch

Min.
Return

Boiler

Heat
Demand

Max. or
Setpoint

Pump

%

of full

output

Test