Rockwell Automation 2300 Family of Drive Systems Hardware User Manual
Page 64
![background image](/manuals/580704/64/background.png)
Index-2
Motor Control Center (MCC) installation
bolting sections together 1-10
completing inside 1-12
completing outside 1-14
preparation, inside 1-5
preparation, outside 1-2
putting sections in place 1-10
sections, unpacking 1-1
tools required for 1-1, 2-1, 3-1
N
N-code chassis weight, 2364F 3-4, 3-5
P
panel mounted units
preparing inside 1-9
panel-mounted units
PE (equipment grounding conductor) 5-15
power bus plate, removing 1-3
power bus splice configurations 5-3
precautions, safety P-2
R
reference publications P-4
reinforcing angles
installing 3-5
roll-out chassis units
completing inside 1-13
installing 3-5
preparing inside 1-5
weights 3-4, 3-5
S
safety precautions P-2
screwlatch locations 2-2
splice opening cover
support services P-6
T
TE (zero potential conductor) 5-16
top hat assembly, installing 6-1
U
upper brackets
securing chassis to 3-5
W
weight
A-frame bucket, 2362 2-3, 2-5
B-frame bucket, 2362 2-3, 2-5
C-frame bucket, 2362 2-3, 2-5
D-frame chassis, 2362 3-4, 3-5
E-frame chassis, 2362 3-4, 3-5
F-frame chassis, 2362 3-4, 3-5
G-frame chassis, 2362 3-4, 3-5
K-code chassis, 2364F 3-4, 3-5
L-code chassis, 2364F 3-4, 3-5
M-code chassis, 2364F 3-4, 3-5
N-code chassis, 2364F 3-4, 3-5
wireway cover, removing 1-2, 3-2
Z
zero potential conductor (TE) 5-16