Chapter 1, Installing mcc sections, Introduction – Rockwell Automation 2300 Family of Drive Systems Hardware User Manual
Page 13: Before you begin, Preparing the system for bus splice installation

Chapter
1
Installing MCC Sections
Introduction
This chapter provides procedures for installing CENTERLINE Bulletin
2100 motor control center sections.
Before You Begin
Before you begin installation, be sure you have the following:
• The MCC sections containing the drive system
• Tool(s) you will need to:
– remove and tighten screws:
slotted screw
slotted/phillips screw
#10 thread-forming hexhead screw (0.312” across flats)
¼” thread-forming screw (0.375” across flats)
– remove and tighten bolts:
¼” bolt (0.438” across flats)
½” bolt (0.750” across flats)
– secure screws with nuts:
¼”-20 nut (0.438” across flats)
Preparing the System for
Bus Splice Installation
Follow these procedures to prepare the MCC sections for installation:
Important: Physical restrictions at your installation site may not allow the
following sequences to be followed exactly as stated.
Unpacking the MCC Sections
1. Remove the MCCs from their packaging.
Important: Be sure to handle the MCCs according to the instructions
provided in CENTERLINE Motor Control Centers (AB
Publication 2100-5.5).
2. Remove all splice kits and labels from wireways, blank unit spaces, and
other external packaging.
Note: A label on the outside of a compartment designates the location of splice kits
located within a horizontal wireway or blank unit space.
Note: Keep track of splice kits. Misplaced splice kits may not have immediate
replacements available.