Setup and Commissioning

Setup

Check the following components of the SyncPro II once it has been installed.

R

F

1 & R

F

2 Resistor Setup

The synchronous motor field discharge resistor feedback resistors (RF1, RF2) are
necessary to attenuate the induced voltage waveform which appears across the
field discharge resistor during starting (

Figure 11

). The resistors (RF1, RF2)

reduce the voltage which is seen at the terminals of the analog/digital pulse
converter to a level which is acceptable to the optoisolators on the board.
Guidelines for resistor settings are contained in

Table 1 on page 36

.

The resistance value shown is the amount of resistance which is required on each
lead which is connected to the A/D pulse board (F1, F2). For example, if the
induced voltage on the discharge resistor is 1000V at zero speed and 600V at 95%
speed (across the entire discharge resistor), then it is necessary to select taps on
the RF1 and RF2 to provide 20 k

Ω

at RF1 and 20 k

Ω

at RF2.

Figure 10 - Discharge Resistor Installation

These settings must be made prior to any start attempt.