Domes, Part 1: installation instructions – USG Domed Ceilings and Barrel Vaults User Manual

Page 8

background image

Page 8 of 12

Part 1:

Installation

Instructions

Domes

Step 7

Install additional

Additional headers and secondary spokes are generally needed for domes larger than 21 in diameter

headers and spokes

(dimension L).

For construction of additional headers and spokes, refer to tables 1.2 and 1. of the Construction

Specifications. Progression of assembly is H1, S2, H2, S, and so on

(Figure 12)

.

Figure 12 – Assembly progression of headers and spokes














Step 8

Install cross tees

Beginning at the perimeter, cut, fit, and screw-attach cross tees into all openings so that the maximum
open space is 16 inches

(Figure 13)

. For the length of the perimeter cross tee, refer to the general data in

the construction specifications.

Figure 13 – Cross-tee installation










Tip:

Exact locations of cross tees are not critical in this step since their purpose is only to provide a surface for

material attachment.

Step 9

Finish the dome

Brace the completed dome suspension system against the surrounding structure as necessary to prevent move-
ment. Apply lath and plaster to the exposed surface of the suspension system as indicated on the architectural
plans. Use S

truCto

-B

aSe

plaster only. Check the architectural plans for any perimeter transition treatments

that may be required. Examples may be found in the USG drywall suspension system brochure (AC12).

cross tees

perimeter cross tees

cut to fit 16" o.c.

S2

S3

H2

H1

S1