Step 3

Install main tee ribs

The construction specifications indicate the total arc length required for each main-tee rib (dimension G).
Begin constructing each rib by hanging a main tee at the apex. Hang the main tee so that a cross-tee slot
is at the apex

(Figure 16)

. Work outward at both ends, connecting curved tees as needed using splice plates

provided

(Figure 17)

. Grid face elevations (measured from perimeter) are shown in Table 2.1 of the Construction

Specifications to aid leveling of ribs (dimension H). If the barrel vault terminates into a wall, the perimeter
hanger wire may be omitted. Instead, tie back or mechanically fasten the main-tee perimeter as required.

Figure 16 – Hang main tees










Figure 17 – Join curved tees











Step 4

Install cross tees

Install cross tees to connect main-tee ribs

(Figure 18)

. Use spacing as indicated on the Construction

Specifications.

Figure 18 – Cross-tee installation


apex

apex

H

G

cross tees

cross-tee
spacing as
specified