beautypg.com

Domes, Part 1: installation instructions – USG Domed Ceilings and Barrel Vaults User Manual

Page 3

background image

Page of 12

Part 1:

Installation

Instructions

Domes

Tip:

It may be easier to mark hanger locations on a tape measure or a long stick and use this as a template

against the ceiling. If there are many obstructions, it may be easier to mark the locations on strips of tape along
the floor

(Figure 4),

then use a laser to project the points to the ceiling.

Tip:

Extra hanger holes are provided to help work around obstructions; however, the space between any two

hanger wires must not exceed 2 (every fourth hole).

Eight rows of hanger wires radiate from the center of the dome. As these rows diverge by more than 4,
additional rows of hanger wires need to be inserted between them

(Figure 4)

.

Figure 4 – Hanger wire locations from floor





















strips of tape

applied to floor

B

22

1

/

2

˚

hanger wire

locations for

primary spokes

secondary spokes must

be inserted between

primary spokes where

this dimension exceeds 48"

hanger wire

locations for

secondary

spokes

Technical Service 800 USG.4YOU

Samples, Literature 888 874.2450

Customer Service 800 950.3839

usg.com