Part 1:

Installation

Instructions

Domes

Step 6

Install secondary

Use the primary spokes as a model for hanger locations on the eight (8) secondary spokes. Table 1.2 of the

spokes

Construction Specifications indicates the length of the secondary spokes (dimension D). It is important to have
the slots and hanger holes on the primary spokes line up with the ones on the secondary spokes. The only
way to do this is to build the secondary spokes working inward from the perimeter of the dome. Examine
the end of the primary spoke. Measure the distance from the end of the spoke to the first hole

(Figure 10)

(dimension X). Cut the new spoke using the same offset distance and build the new spoke working inward from
the perimeter toward the header

(Figure 10)

. Attach the secondary spoke and a hanger wire to the midpoint

of the header

(Figure 11)

.

Figure 10 – Trim and position secondary spoke









Figure 11 – Attach secondary spoke and hanger wire to midpoint of header











secondary

spoke S2

primary spoke S1

distance to

first cross tee slot

distance to first

cross tee slot

header

X

X

secondary

spoke

header

hanger wire